পাতা:বাংলাদেশের স্বাধীনতা যুদ্ধ দলিলপত্র (চতুর্দশ খণ্ড).pdf/৩৮৬

এই পাতাটির মুদ্রণ সংশোধন করা প্রয়োজন।

354 বাংলাদেশের স্বাধীনতা যুদ্ধ দলিলপত্রঃ চতুর্দশ খন্ড Resistance link Fighting now cenres on the King Bridge, connecting Sylhet's two halves. If the Army succeeds in destroying the bridge, it will cut a main link of the Bangladesh resistance. Yet such a victory would be of small value to the central Government, whose forces are and seem likely to remain, not less hard pressed than the Mukti Fouz. The Army has no hope of gaining control of the countryside, Heavy pre-monsoon rains are already making movement difficult and the population is hostile to a man, When the monsoon begins in earnest, late this month, bringing some of the heaviest rainfall in the world for weeks on end, the Army will be completely bogged down.