পাতা:বাংলাদেশের স্বাধীনতা যুদ্ধ দলিলপত্র (তৃতীয় খণ্ড).pdf/৬৮৬

এই পাতাটির মুদ্রণ সংশোধন করা হয়েছে, কিন্তু বৈধকরণ করা হয়নি।



654

বাংলাদেশের স্বাধীনতা যুদ্ধ দলিলপত্রঃ তৃতীয় পত্র

 visit the Reception Camp periodically, for audit of accounts and payment of advance subject to pre-audit adjustments. The team will submit lo the Chairman, Board of control through the Director, the audit report together with a general report on the Camp. Advisory Committee will extend all necessary help and co-operation to the Audit Team.

 11. INSPECTION GROUP:

 An inspection group consisting of MNA/MPA and other political leaders, will be farmed by the Chairman, Board of Control. There will be one group for each Zone. The Group will visit the Reception Camps and forward necessary report to the Chairman, together with their recommendation. The Director, Reception Camps will simultaneously receive a copy of the report and recommendations.

 12. DIRECTOR, RECEPTION CAMPS:

 Each Zone has a Director-in-charge of Reception Camps. As already mentioned under “Functional instructions", the Director will be in direct contact with the Advisory Committee and have adequate knowledge of the practical running of the camp with a view to remove difficulties and introduce improvements. For this purpose, the Director or his Deputy will visit the camp frequently. The Director, Reception Camps, Headquarters, will also visit Reception Camps from time to time. The Director will submit necessary reports to the Board every week.


______________